Demo Login
Industrial ERP ArchitectureJaipur Fabrication Plant Demo100% Local Persistence

From Raw Materials to Finished Products—Manage Production in One Place.

Engineered for furniture manufacturers, light metal fabricators, and assembly units. Gain complete operational visibility across raw material procurement, Bills of Materials, shop floor job cards, multi-gate quality clearance, and dispatch delivery challans.

Sign In with Demo Personas (9 Roles)
Or enter directly as:
Deterministic Stock Reservation
Zero Phantom Inventory Deductions
Print-Ready Delivery Challans
PLANT_TELEMETRY: JAIPUR_VKI
Active Demo State

Active Production

1 Orders

48 pcs produced

Raw Material Valuation

₹2,52,855

Weighted average cost

Production Achievement65.8%
Target: 73 UnitsCompleted: 48 Units
QC First-Pass Rejection3.8% (Tolerable)

Production Flow

An Interconnected Workflow Without Information Silos

Every operation updates inventory, costing ledgers, and operational dashboards in lockstep. Select any stage below to inspect its operational logic.

STAGE 01·Purchase orders with dual-gate inspection

Procurement & Quality GRN

Raise POs against preferred suppliers. When shipments reach the gate, record accepted vs rejected units during Goods Receipt (GRN). Only verified material credits into usable inventory.

Audited Benefit: Zero uninspected stock slips

Pre-seeded with real Jaipur furniture & light fabrication transactions.

Role-Based Access Architecture

Every Department Gets Exactly What They Need — Nothing Less, Nothing More.

Real industrial facilities partition authority to enforce material accountability and ISO compliance. Explore our 9 distinct factory roles below. Click any role to jump directly into their tailored workspace.

Owner / Super Admin35 Modules

Complete access across all plant modules, financial books, and approvals.

Core Authority:

ALL
Production Manager18 Modules

Authorized for BOMs, planning, work orders, shop floor routing, WIP, and production analytics.

Core Authority:

CREATE_BOMEDIT_BOMPLAN_PRODUCTION+6 more
Storekeeper10 Modules

In charge of raw materials custody, goods receipt (GRN) posting, material issue slips, returns, and inventory counts.

Core Authority:

RECEIVE_GRNISSUE_MATERIALACCEPT_RETURN+3 more
Production Supervisor9 Modules

Directs shop floor operations, job card progress, shift output logging (good/reject/scrap), and operator labor hours.

Core Authority:

LOG_PRODUCTIONUPDATE_JOB_CARDRECORD_SCRAP+2 more
Quality Inspector8 Modules

Enforces ISO & BIS quality gates. Inspects incoming GRNs, tests WIP tolerances, and clears finished goods into sellable stock.

Core Authority:

INSPECT_GRNINSPECT_WOAPPROVE_QA+2 more
Procurement Manager9 Modules

Manages suppliers, runs MRP purchase calculations, submits purchase orders, and initiates supplier returns.

Core Authority:

MANAGE_SUPPLIERSCREATE_POSUBMIT_PO+2 more
Dispatch Manager8 Modules

Oversees customer orders, allocates finished goods, assigns carrier fleets, and issues official delivery challans.

Core Authority:

ALLOCATE_STOCKCREATE_DISPATCHISSUE_CHALLAN+2 more
Accountant / Cost Analyst7 Modules

Audits standard BOM costing vs actual variance, records factory overhead and utility vouchers, and reviews scrap drag.

Core Authority:

VIEW_COSTINGBOOK_EXPENSEANALYZE_VARIANCE+1 more
Maintenance Technician5 Modules

Maintains machine fleet, conducts preventive lubrication rounds, fixes breakdown tickets, and logs machine uptime.

Core Authority:

SCHEDULE_MAINTENANCERESOLVE_TICKETUPDATE_MACHINE_STATUS+1 more

Enterprise Modules

Built Specifically for Physical Fabrication & Assembly Units

Generic CRM and retail inventory software fail on the factory floor because they lack routing job cards, multi-gate quality holds, and BOM scrap math. ForgeFlow was purpose-built for fabrication.

Multi-Level Bill of Materials

Define recursive components for sheets, tubes, fasteners, glues, and packaging. Automatically calculate batch cost multipliers with precise scrap allowances.

Deterministic MRP Lite

Calculate exact shortages against planned work orders using: Net Shortage = max(0, Gross Requirement − Eligible Available Stock). Generate PO drafts with one click.

Machine & Workstation Scheduling

Manage CNC wood routers, tube circular saws, TIG welding booths, and powder coating lines. Track runtime hours, efficiency ratings, and preventive lube cycles.

Multi-Gate Quality Control

Enforce pass/fail checklists for incoming GRNs and completed work orders. Rejected output cannot enter sellable finished stock, safeguarding customer reputation.

Delivery Challans & Dispatch

Generate industrial delivery challans (DC) with transporter details, driver contact numbers, and vehicle registration. Deduct finished goods stock automatically.

Actual vs Standard Costing

Compare estimated BOM component expenses against actual material consumption logs, direct machine electrical load, and labor hours per unit produced.

OPERATIONAL CASE STUDY·JAIPUR REGION
“Before ForgeFlow, our storekeeper and assembly supervisor relied on paper slips and WhatsApp groups. We frequently stopped our 3-axis CNC router because someone forgot to reorder fasteners or edge-banding tape. With ForgeFlow’s real-time BOM reservations and Goods Receipt QC, we cut work-in-progress idle time by 32% within two months.”

Rajesh Sharma

Managing Director · Rajasthan Modular Systems, Sitapura, Jaipur

Ready to Test the Live Manufacturing Suite?

The demo application is fully interactive. Create purchase orders, reserve materials against BOMs, simulate production floor output, and print authentic delivery challans.

Zero login required · All transactions persist in your local browser sandbox